Work to start on Monday, May 21
This item is available in full to subscribers.
To continue reading, you will need to either log in to your subscriber account, below, or purchase a new subscription.
Please log in to continue |
ROCHELLE – The Illinois Tollway is scheduled to begin ramp resurfacing work at the Illinois Route 251 Interchange on the Reagan Memorial Tollway (I-88) in Rochelle next week. The repair work will require ramp closures and detours. Electronic message signs and construction signage will be put in place to alert drivers in advance.
Weather permitting, on Monday, May 21, the ramp connecting Illinois Route 251 to eastbound I-88 is scheduled to close for up to five days. The ramp will not be closed over the weekend. A detour will be posted directing traffic to use Lincoln Highway (Illinois Route 38) and the I-39 Interchange to access I-88.